国产亚洲一区二区三区在线观看,欧美日韩国产综合一区二区三区,国产成人午夜极速观看,精品国产无限资源免费观看,2020国产精品视频,91精品国产福利尤物,欧美一区二区久久精品,精品中文字幕一区二区三区四区,2020国产成人精品视频人

您好,歡迎光臨北京天樂倩潔國際貿易有限公司!

服務熱線:400-004-1866

天樂倩潔地固9公斤/桶-價格:185元/桶

發(fā)布日期:2020-09-27

天樂倩潔地固9KG

【地固的定義】

一種作用于水泥地面上的涂料,適用于家庭裝修或工程裝修初期水泥地面的封閉處理,防止跑沙現(xiàn)象,地固耐水防潮,可以避免木地板受潮氣侵蝕而產(chǎn)生變形,也可以避免日后從地板縫隙中“撲灰”。

【地固的作用】

1、適用于家庭裝修或工程裝修初期水泥地面的硬化處理,可以有效地避免后續(xù)施工中水泥地面的灰塵顆粒附著在工作面上的現(xiàn)象,從而提高批刮膩子和刷乳膠漆的質量。

2、地固耐水防潮,可以避免木地板受潮氣侵蝕而產(chǎn)生的變形。

3、也用于石膏找平地面的固化,可有效防止日后地面“撲灰”現(xiàn)象

【施工要求及注意事項】

1、使用前先將水泥地面清掃干凈。

2、灑少量清水潤濕地面。

3、滾刷或涂刷均可,間隔1小時涂第二次。

4、施工溫度在5℃以上,理論干燥時間為8小時。

配制單組分地固:

液料:水=1:2(重量比);

使用時將液料倒入容器中,按比例加清水攪拌均勻后即可使用。

理論涂刷面積:100平方米(根據(jù)地面條件不同而定)

保質期:12個月

執(zhí)行標準: GB18583-2008

[Product Name] Ground Solidification

Features:

Super penetration

Two-sided affinity

Dust emission prevention

Green and eco-friendly

[Definition of ground solidification] It is a kind of coating applied to the cement floor, suitable for the closed treatment of cement floor in the early stage of home decoration or engineering decoration, which can prevent dust emission. The ground solidification is water-proof and moisture-proof. It can avoid the deformation of wood floor due to moisture erosion also can avoid "dusting" from the floor gap in the future.

[The role of ground solidification]

1. It is suitable for the hardening treatment of cement floor in the early stage of home decoration or engineering decoration, which can effectively avoid the dust particles of cement floor, adhering to the working face in the subsequent construction, so as to improve the quality of putty and emulsion paint. 2. The waterproof and moisture-proof ground solidification can avoid the deformation of wood floor caused by moisture erosion. 3. It can also be used for the solidification of gypsum leveling ground, which can effectively prevent the "dusting" phenomenon of the ground in the future.

[Construction requirements and precautions]

1. Clean the cement floor before use. 2. Sprinkle a small amount of water to wet the ground. 3. Rolling brush or brush can be used, and the second time is applied at an interval of 1 hour. 4. The construction temperature is above 5 ℃ and the theoretical drying time is 8 hours.

[Preparation of one component ground solidification]

Liquid material: water = 1:2 (weight ratio); When using, pour the liquid materialintothe container, add water according to the proportion, and mix evenly before use. Theoretical painting area: 100 square meters (according to different ground conditions) Retention period: 12 months Executive standard: DB11/3005-2017


分享到: